CLIENT: Enerven / ElectraNet LOCATION: Adelaide, SA. SCOPE: APD Global was engaged by Enerven to produce the design for ElectraNet’s Unit Asset Replacement project at five of their substations. TECHNICAL SITUATION ElectraNet initiated a Unit Asset Replacement (UAR) for the regulatory period 2018-2023 involving substation asset replacement, namely; circuit breakers, isolators, surge arrestors, voltage transformers,…
Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in
/home/apdgloba/public_html/wp-includes/formatting.php on line
3479
Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/apdgloba/public_html/wp-includes/formatting.php on line 3479
CLIENT: Alinta Energy & Western Power LOCATION: Wagerup & Pinjarra, WA. SCOPE: Western Power Technical Rules requires Large Generation Plants to undertake Compliance Testing & Model Validation works when upgrade/modification works are proposed for the power plant installations or their associated controllers (AVR, Governor, PSS etc.). Alinta Energy required to complete the site testing &…
APD Global undertook power system studies, arc flash and protection scheme design associated with new 22kV HV Switchboards and 415V LV Switchboards as part of the Australind Titanium Dioxide Plant HV Distribution Upgrade.
APD Global was requested by Energy Made Clean to complete a HV submission to satisfy the Western Australian electrical requirements for the Northam solar farm.