NAMMULDI AGRICULTURAL PROJECT (NAP) – PIVOT CONTROL SYSTEM SIMPLIFICATION
Review of the Agricultural Pivot Control System, implementation of the recommended simplification design and construction.
Review of the Agricultural Pivot Control System, implementation of the recommended simplification design and construction.
APD was hired to perform detailed design and development in integrating two new potable water tanks and associated equipment into the plant Process Control System (PCS) at Yandi Mine.
APD was hired to perform detailed design and development in integrating the conveyor emergency stop system into the plant Process Control System (PCS) at BHP Mine Area C.
Power System Studies, Protection Grading Analysis, Earthing System Design & Site Testing.
Site Inspection, Earthing Design & Drawings, EPR Hazard Assessment on 3rd Party Assets, Current Injection Testing.
APD was hired to perform detailed design and Process Control System (PCS) integration for a Variable Speed Drive (VSD) replacement of two vent fan soft starters at Wheelara and OB18.
Engineering, Procurement, Construction and Management (EPCM)
Soil testing, detailed EPR/LFI study, earthing design and injection testing.
Earthing Design & EPR Assessment and Step & Touch Measurement.
Soil Testing, Earthing Design, Conductor Sizing, Step & Touch Assessment, Earth Injection Testing.
Provision of electrical engineering design and field services for large scale commercial development.
Provision of distribution design, lighting design, detailed earthing assessments and subsurface location services for the retrospective undergrounding of Western Power overhead lines in the Town of Claremont. Part of the WA State Undergrounding Power Project (SUPP).
Complete design, procurement, testing and construction management for the replacement of an existing 6.6kV Switchboard. Existing switchboard was split into separate boards with a total of 25 panels. All works were carried out within a brownfield powerstation environment with limits on outages and construction schedules.
APD was hired to perform detailed design and commissioning for the replacement of 66 kV Oil Circuit Breakers (OCB’s) at 5 different substations around Newman.